Dragon Construction Equation Project

Grade Levels
7th
Resource Types
Common Core Standards
Product Rating
Not yet rated
File Type
PDF (Acrobat) Document File
Be sure that you have an application to open this file type before downloading and/or purchasing.
0.54 MB   |   9 pages

PRODUCT DESCRIPTION

Students will use what know about algebraic expressions and equations to determine the costs of building a home with a $350,000 budget. Students will need to decide on materials and figure the cost. The students will also be paying the contractor for her time. Will they have money left over in their budget after the build is complete?

Blue print included.
Rubric included.
Total Pages
9
Answer Key
Rubric only
Teaching Duration
3 Days

Average Ratings

N/A
Overall Quality:
N/A
Accuracy:
N/A
Practicality:
N/A
Thoroughness:
N/A
Creativity:
N/A
Clarity:
N/A
Total:
0 ratings
COMMENTS AND RATINGS:
Please log in to post a question.
PRODUCT QUESTIONS AND ANSWERS:
$4.00
Digital Download
ADD ONE TO CART
User Rating: 4.0/4.0
 (7 Followers)
$4.00
Digital Download
ADD ONE TO CART
Dragon Construction Equation Project
Dragon Construction Equation Project
Dragon Construction Equation Project
Dragon Construction Equation Project