Whoops! Something went wrong.

Click here to refresh the page

Engineering Team Tower Building

Engineering Team Tower Building
Engineering Team Tower Building
Engineering Team Tower Building
Grade Levels
Product Rating
File Type

PDF (Acrobat) Document File

Be sure that you have an application to open this file type before downloading and/or purchasing.

1 MB|4 pages
Product Description
This activity is great for the beginning of the year for any science class and at any level. It’s the first activity I do before I start doing labs because it really emphasizes teamwork and what it takes to be a productive, responsible, cooperative, hard working and patient group member for labs and activities.

The only materials you need are 1 cup, 1 piece of tape (I give them 6 inches of masking) and 1 piece of paper. Before I give them the materials I have them write down the 5 most important parts of teamwork and we then discuss that.

They then discuss as a team how they will build their tower and draw a model/prototype. Once they have all of this done I then allow them to gather their materials and begin to build.

As groups finish I come by with a meter stick and yell out the measurements to the class. As they hear the measurements of the different groups it motivates them to rebuild and redesign (an important part of engineering).
Please give feedback, review on TPT and email me with any ask questions: craigwilliams4291@gmail.com
Thanks so much!!!
Total Pages
4 pages
Answer Key
Included
Teaching Duration
45 minutes
Report Copyright Infringement
  • Comments & Ratings
  • Product Q & A
Loading...
$1.99
Digital Download
Add one to cart

Advertisement

Advertisement

$1.99
Digital Download
Add one to cart
Teachers Pay Teachers

Teachers Pay Teachers is an online marketplace where teachers buy and sell original educational materials.

Learn More

Keep in Touch!

Sign up