TPT
Total:
$0.00
Preview of Bridge Building STEM Sprint – Jungle Structural Engineering | Grade 2

Bridge Building STEM Sprint – Jungle Structural Engineering | Grade 2

Created by
STEM With Mr.B
In the Habitat Corridor Bridge Sprint, students become conservation engineers as they design and build a bridge structure that spans a gap to connect two separated wildlife habitats. Set inside the Jungle Rangers narrative theme and tied to UN Sustainable Development Goal 15 (Life on Land), this 2-week unit challenges Grade 2 students to apply structural engineering principles to a real-world conservation problem — building a bridge that holds weight while spanning a required gap. What Students
Showing 1-1 of 1+ results